Development of Delays Claims Assessment Model

preview-18
  • Development of Delays Claims Assessment Model Book Detail

  • Author : Sasan Golnaraghi
  • Release Date : 2011
  • Publisher :
  • Genre :
  • Pages : 225
  • ISBN 13 :
  • File Size : 73,73 MB

Development of Delays Claims Assessment Model by Sasan Golnaraghi PDF Summary

Book Description: Disputes in the construction industry originate primarily from the occurrence of delays, which are the major causes of time and cost overruns in construction projects. Delays affect project parties, the owner and the contractor. Loss of either anticipated revenue or opportunity cost, on the owner's side, and increased overhead cost, cost escalation and liquidated damages, on the contractor's side, are considered as the main impacts of delays on key project stakeholders. Meanwhile, preparing delay claims is a time consuming process that requires extensive resources. Facilitating this process will benefit both project parties. In this regard, this research presents a new systematic delay analysis technique that is capable of evaluating concurrent delays, while considering the critical path of the project. The developed technique precisely allocates delays among the different project parties. The technique is tested against a hypothetical case to highlight its advantages and limitations, in comparison to existing delay analysis methods. In support of the proposed technique, a robust expert system is designed to classify the different types of delays, as well as to offer recommendations on delays or delaying events. The expert system and the proposed delay analysis technique are integrated with a scheduling software which accesses a project database. Likewise, an embedded feature of computing associated costs enhances the capability of the system. The developed system assist the analyst to reduce the time and cost associated with delay claim preparation in a systematic approach. Finally, the reliability of the integrated system is validated through a real case.

Disclaimer: www.yourbookbest.com does not own Development of Delays Claims Assessment Model books pdf, neither created or scanned. We just provide the link that is already available on the internet, public domain and in Google Drive. If any way it violates the law or has any issues, then kindly mail us via contact us page to request the removal of the link.

Delay Analysis in Construction Contracts

Delay Analysis in Construction Contracts

File Size : 1,1 MB
Total View : 994 Views
DOWNLOAD

The most significant unanticipated costs on many construction projects are the financial impacts associated with delay and disruption to the works. Assessing th

Construction Delay Analysis Simplified

Construction Delay Analysis Simplified

File Size : 77,77 MB
Total View : 7801 Views
DOWNLOAD

This book is written for busy professionals who need guidance on Delay Claims. The content is informed by intensive research conducted over many years aimed to

Construction Delays

Construction Delays

File Size : 38,38 MB
Total View : 8720 Views
DOWNLOAD

This book provides guidance on delay analysis, particularly in relation to extension of time submissions. It gives readers the information and practical details

Construction Project Delays

Construction Project Delays

File Size : 63,63 MB
Total View : 6710 Views
DOWNLOAD

Delays are the most common and costly problem in construction projects. The Owner assigns a Supervisor (OS) - either an individual Supervisor Engineer (SE) or a