Remedial Investigation/feasibility Study for the Clinch River/Poplar Creek Operable Unit. Volume 5. Appendixes G, H, I, J.

preview-18
  • Remedial Investigation/feasibility Study for the Clinch River/Poplar Creek Operable Unit. Volume 5. Appendixes G, H, I, J. Book Detail

  • Author :
  • Release Date : 1995
  • Publisher :
  • Genre :
  • Pages : 142
  • ISBN 13 :
  • File Size : 30,30 MB

Remedial Investigation/feasibility Study for the Clinch River/Poplar Creek Operable Unit. Volume 5. Appendixes G, H, I, J. by PDF Summary

Book Description: The Quality Assurance/Quality Control (QA/QC) Program for Phase 2 of the Clinch River Remedial Investigation (CRRI) was designed to comply with both Department of Energy (DOE) Order 5700.6C and Environmental Protection Agency (EPA) QAMS-005/80 (EPA 1980a) guidelines. QA requirements and the general QA objectives for Phase 2 data were defined in the Phase 2 Sampling and Analysis Plan (SAP)-Quality Assurance Project Plan, and scope changes noted in the Phase 2 Sampling and Analysis Plan Addendum. The QA objectives for Phase 2 data were the following: (1) Scientific data generated will withstand scientific and legal scrutiny. (2) Data will be gathered using appropriate procedures for sample collection, sample handling and security, chain of custody (COC), laboratory analyses, and data reporting. (3) Data will be of known precision and accuracy. (4) Data will meet data quality objectives (DQOs) defined in the Phase 2 SAP.

Disclaimer: www.yourbookbest.com does not own Remedial Investigation/feasibility Study for the Clinch River/Poplar Creek Operable Unit. Volume 5. Appendixes G, H, I, J. books pdf, neither created or scanned. We just provide the link that is already available on the internet, public domain and in Google Drive. If any way it violates the law or has any issues, then kindly mail us via contact us page to request the removal of the link.